04
Precedence Processor
| pri | exec | operation | deps | ms | valid | timestamp |
|---|---|---|---|---|---|---|
| 1 | — | Camera Capture | — | — | — | — |
| 2 | — | Feature Extraction | capture | — | — | — |
| 3 | — | Numeration | extract | — | — | — |
| 4 | — | Precedence Evaluation | numer | — | — | — |
| 5 | — | Fourier Domain A | numer | — | — | — |
| 5 | — | Fourier Domain B | numer | — | — | — |
| 6 | — | Bayesian Inference | fftA · fftB · ffql | — | — | — |
| 7 | — | FFQL-01 Quadratic | numer · prec | — | — | — |
| 8 | — | Polarity Evaluation | ffql · prec · fftA · fftB | — | — | — |
| 9 | — | Limit Analysis | ffql · prec | — | — | — |
| 10 | — | Intent Classification | bayes · fftA · fftB | — | — | — |
| 11 | — | Spatial Output | intent · polar · limit | — | — | — |
pri is the declared mathematical priority of the procedure; exec is the dependency-resolved execution order actually used. FFQL-01 is a dependency of the Bayesian quadratic hypotheses, so it executes before inference while keeping its declared priority — mathematical precedence and software execution order are different things.
→
Manual numerical comparison
Manual integers are used directly — the quantization rule is bypassed by explicit input.
P
Precedence expression
Both branches are evaluated independently and never merged into a single result.
P+ = 2(n + I)
—
n = —
P− = 2(n − I)
—
positive branch
✓
Stage validation
start the camera to populate the timeline